Mantis 5000 Especificaciones Pagina 28

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 49
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 27
Figure 25. The PTFE standard fits into the sample cup.
b) Fit the aperture onto the sample cup.
c) Place the sample cup over the reflectance or transmission port.
Note
It is recommended that you use the same aperture size to run the baseline as the
one you are going to use for the sample.
d) Click the Zero/Baseline button in the Scan application to collect the 100% T
baseline.
e) If you are performing a reflectance measurement, remove the PTFE standard
from the sample cup and replace the sample cup at the reflectance port with the
aperture attached. If you are performing a transmission measurement, block the
transmission port with a blocking plate.
f) Click the Zero/Baseline button to collect the 0% T baseline.
g) Once the baseline is complete the ordinate status reading will display 'Zero
Baseline' in red text.
Installing the polarizer
Vista de pagina 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 48 49

Comentarios a estos manuales

Sin comentarios